This kitchen extension was designed entirely in house and despite being one of our larger extensions was started on Sept 1st and handed over fully completed on Dec 15th including a new bathroom above the kitchen and fully refurbished living room incorporating a TV snug and music room. The combination of an extremely manageable build area accessible directly from the street as well as a very wide and quiet road to the front meant that we could maximise every possible efficiency to ensure the clients were in for the holidays. The hardwood patio doors were made in our own workshop in West London and the client still cannot decide if she loves these more than the handmade kitchen or the secret larder room.
//